Piedmont Commences Next Phase of Metallurgical Testwork

Piedmont Lithium Limited (Piedmont or Company) has commenced a PFS-level metallurgical testwork program at SGS Canadas facilities in Lakefield, Ontario. The testwork will be completed using composite and variability samples collected from drill cores produced during the Companys Phase 2 and Phase 3 drill campaigns.

The planned testwork program builds on the success of the Companys 2018 bench-scale testwork which previously demonstrated spodumene concentrate grades of 6.0-6.5% Li2O with low iron content of 0.66-0.76% Fe2O3.

New tests will include evaluation of Dense Medium Separation (DMS) technologys potential to function as a pre-concentration step to production of high-quality spodumene concentrate. Locked-cycle flotation tests will also be performed on composite and variable samples to verify prior testwork and estimate spodumene recoveries.

The results of the testwork program will be used to further optimize the process flow diagram during the next phases of technical study of the Companys planned spodumene concentrator. Test results will also be used to design a pilot testwork program planned for the second half of 2019. Additional by-product testing is also planned in the second half of 2019.

Piedmont is also pleased to announce the appointment of engineers and consultants supporting the Company in areas of environmental study, permitting, metallurgy, mining engineering, exploration, and land acquisition as the project team focuses on a construction decision by the end of 2019.

WANT TO BUILD A FINANCIAL EMPIRE?

Subscribe to the Global Banking & Finance Review Newsletter for FREE
Get Access to Exclusive Reports to Save Time & Money

By using this form you agree with the storage and handling of your data by this website. We Will Not Spam, Rent, or Sell Your Information.
All emails include an unsubscribe link. You may opt-out at any time. See our privacy policy.

Our full announcement and our complete list of consultants can be seen here.

Keith D. Phillips, President and Chief Executive Officer, said, We are pleased to be working with SGS Lakefield on the next phase of our metallurgical testing. SGS is a global leader with extensive experience in the field of spodumene concentrate testwork. We are also pleased to announce the appointments of several additional consultants experienced in areas critical to our success. Our Phase 4 drill campaign is going very well, and we look forward to reflecting this in important engineering studies over the course of 2019.

For further information:
Keith D. Phillips
President &
CEO
T: +1 973 809 0505
E: [email protected]

Anastasios (Taso) Arima
Executive Director
T: +1 347
899 1522
E: [email protected]