Stantec assists Metro Purple Line Extension Project on Section 1 “Halfway There” Construction Milestone

Stantecas a senior member of the Westside Extension Support Team (WEST) joint ventureis providing construction management support services to assist the Los Angeles County Metropolitan Transportation Authority (Metro) in overseeing the design-build station and tunnel contracts, and design-bid-build utility contracts for the high-priority Purple Line Extension project, which celebrated a major milestone on June 2the halfway completion mark for construction on Section 1, the first four-mile subway section between Koreatown and Beverly Hills.

The project, which comprises three different construction sections, is set to significantly improve mobility between downtown Los Angeles and West Los Angeles. Stantecs services include administration of the construction contracts and documenting that construction is completed safely and to Metros contract specifications. In addition to Stantec, the WEST joint venture includes 13 small business partners9 of whom are Disadvantaged Business Enterprises.

The critically important Purple Line Extension Project will provide a high-capacity, reliable transit alternative for commuters to travel between downtown Los Angeles, the Miracle Mile, Beverly Hills, Century City, and Westwood, where stations will be near UCLA and the VA Hospital. From the current terminus at Wilshire/Western, the Purple Line will extend westward for about nine miles and add seven new stations, providing easy access to the Westside, the regions second-largest job center. Travel time between downtown Los Angeles and Westwood is expected to be about 25 minutes. Section 1 of the Purple Line project will add three new stations at Wilshire and La Cienega, Wilshire and Fairfax, and Wilshire and La Brea, as well as a new maintenance of way facility. A pair of tunnel-boring machines (TBMs), named Elsie and Soyeon, began work on the four miles of tunnels required for Section 1 in October 2018.

ALSO READ:   MicroPact Powers Illinois Opioid Alternative Pilot Program

Reaching the ˜halfway there mark is an exciting milestone in this critical transit project, said Paul Ryan, Stantecs administrative project manager overseeing the construction support services contract. We are honored to collaborate with Metro as we work to provide greater transit options for residents of Los Angeles. Its exciting to see how far weve come.

Stantec has worked with Metro for more than a decade and previously provided construction management support services for the Interstate 405 “ Sepulveda Pass Improvements Project which improves travel between the San Fernando Valley, the Westside and Los Angeles International Airport. In addition to the Purple Line Extension Section 1, Stantec is currently involved in several critical LA-area transportation projects with Metro, including providing construction management support on the Crenshaw/LAX Corridor project; providing construction management support for the Southwestern Yard Maintenance Facility; and leading the design for the new Willowbrook/Rosa Parks Station Improvement project, which will expand and provide a more efficient passenger experience at one of LAs busiest Metro stations.

We are proud to have a longstanding relationship with Metro, one of the largest public transit agencies in the U.S., said Dean Palumbo, Stantec senior vice president and principal in charge on Purple Line Extension Section 1. Purple Line Extension Section 1 is the latest in a long line of impactful projects for which weve supported Metro, and we are proud to see it reach such a significant milestone. Once complete, the Purple Line project will make a tangible difference in the lives of Angelenos, significantly reducing cross-city travel time.

ALSO READ:   Jackpocket Announces Gaming Industry Veteran Gavin Isaacs as Senior Board Advisor at Betting on Sports America

About Stantec Communities are fundamental. Whether around the corner or across the globe, they provide a foundation, a sense of place and of belonging. Thats why at Stantec, we always design with community in mind.

We care about the communities we servebecause theyre our communities too. Were designers, engineers, scientists, and project managers, innovating together at the intersection of community, creativity, and client relationships. Balancing these priorities results in projects that advance the quality of life in communities across the globe. Stantec trades on the TSX and the NYSE under the symbol STN. Visit us at stantec.com or find us on social media.

Cautionary Note Regarding Forward-Looking Statements This news release contains forward-looking statements regarding the project described above, including statements regarding Stantecs role and involvement on the project. Forward-looking statements also include any other statements that do not refer to historical facts. By their nature, forward-looking statements are based on assumptions and subject to inherent risks and uncertainties. There is a risk that the project described above may be delayed, cancelled, suspended or terminated. This could cause future results to differ materially from the forward-looking statements made in this news release. Except as may be required by law, Stantec undertakes no obligation to publicly update or revise any forward-looking statements. Forward-looking statements are provided herein for the purpose of giving information about the proposed project referred to above and its expected impact. Readers are cautioned that such information may not be appropriate for other purposes.

ALSO READ:   Meinberg to Acquire Oregano Systems

Design with community in mind

Media Contact
Danny Craig
Stantec Media Relations
Ph:
949-923-6085
[email protected]

Investor Relations Contact
Cora Klein
Stantec Investor
Relations
Ph: 780-969-2018
[email protected]